A city in the north of Texas needed a more efficient and easier way to pull their pumps. The cost of pulling steel pipe was too great to warrant its use in their wells any longer. This is when Boreline Flexible Drop Pipe was specified for the job.
The site chosen for the installation has a high concentration of sand entering the well which caused the pumps to fail numerous times a year. Pulling steel pipe at 500 plus feet proved to be an expensive and time consuming job. Using Boreline the city was able to pull and set their pumps in a fraction of the time.