In this project, there is a lot of space available around the wells. Here we will see how the contractor will install the Boreline using a truck and rolling wheel. The rolling wheel is positioned at the wellhead, the Boreline laid over it and the pump hangs in the well.
The top end of the Boreline is fastened to the wellhead and this is attached to the truck. The truck will simply drive towards the well, thereby lowering the Boreline and pump into position. This is really as simple as it looks.
Note all the “hands” just hanging around looking for something to do. Boreline, apart from the usual benefits including non-corrosion and long life, has the advantage of simple, quick and easy installation using fewer operators. It is safer, more efficient and the way to go!